It’s our pleasure, through this profile, to introduce Teams Co. s.a.r.l., which is located in Beirut, Old Saida road, Dallas center, 4th floor and in Ainatha, Bent Jbeil, Hussein Samhat Building, ground floor.

Teams Co. s.a.r.l was founded in June 2010, and Eng. Mouin Hussein Samhat is the general manager and authorized to sign and Executive vice president Mr. Fadi Rizk.

Teams Co. is a contracting company specialized in all public works such as irrigation networks, potable water and sewerage networks and all kinds of civil works. In addition to road works, infrastructure and pavements’ border stones and tiles of all kinds. It was registered in Ministry of Finance for value added tax in September 18, 2011. Since its establishment, the company performs, as a certified contractor by Water Authority in Beirut & Mount Lebanon, reforming of faults and some water installations for the authority in Jbeil, Keserwan, and Metn. In July 2013, the company started reforming faults and some water installations for Water Authority in Southern Lebanon. Moreover, the company has won and executed 2 bids in Bekaa with the Water Authority in Bekaa. The first was the execution of water networks on demand, started in late 2013; the second was the supply of polyethylene pipes and fittings, also started in late 2013.

The company was classified, in 12/9/2011, as first class (except for tunnels and dams) – Table 3 – Grade A – Decree of “committee for classifying contractors”-water no. 195 in Ministry of Energy & Water, based on the companies experience in water works and due to the experience of Eng. Mouin Samhat of more than 18 years in water works, sewerage networks, water treatment plants, concrete water tanks, water towers, and other works requiring great experience in this field.
The company was also classified, in 13/8/2012, as 3rd class in execution of electrical works (except for generators power plants and power stations) – Table 4 – Grade A , and it was raised to the first class – Table 4 – Grade A  in 28/1/2015 .
In addition, the company was classified, in 19/9/2012, in 1st category-buildings in Ministry of Public Works, and 1st category – roads in Ministry of Public Works in 18/12/2014.

The company was classified, in 28/1/2015, as first class in drilling and searching for groundwater  –  Table 5 –  Decree of “committee for classifying contractors”-water no. 230 in Ministry of Energy & Water.

 

 

Objectives

  • To deliver clients the standards of quality specified in the contract within budget.
  • To create and maintain a culture of quality within the company.
  • To meet all legal requirements.
  • To promote strict adherence to safety standards.
  • To provide the resources necessary to achieve the project on schedule.
  • To ensure that all consultants, subcontractors, suppliers and others who are involved in our project meet the required quality standards.

 

 

Services

We provide construction projects that begin with earth – moving works, through to civil and structural works, architectural finishes, interior decoration, and rehabilitation of existing buildings.

Other specific tasks that can be delivered by Teams CO include:

  • Value engineering
  • Project management
  • Cost estimation
  • Design
  • Consultancy
  • Project time schedule
  • Shop drawings
  • Contracting

Experience

As for Eng. Mouin Samhat’s experience in roads and infrastructure, it has started since 1997 as an employee as follows:
1-From November 1997 till may 1998: worked at ASACo in soil and building material testing.
2-From June 1998 till April 1999: worked at Contrancimax in construction of the road from Rai’I Hospital to Ghazieh Bridge.
3-From May 1999 ill August 2000: worked at Al Tajj-Rawa union in Meshref Typical Village in roads construction with infrastructure and pavements.
4-From September 2000 till October 2004: worked at Eng. Yasser Noureddine office in Taybé project including road construction from Baydar Al Fakaani Till Litany River, the construction of a pumping station and a 500m³ water tank in Markaba, in addition to the supervision over Ward Company in Ain Al Zarka project in West Bekaa including the construction of water tanks of 2000m³ capacity, and installation of piping network with variable diameters and overall length of 165 km and construction of 3 pumping stations.
5-From November 2004 till February 2006: worked at Al Bahar Company for reinforced concrete construction.
6-From March 2006 till November 2009: worked at metal contracting & trading company in execution of various water projects, water tanks construction, water treatment and pumping stations in Jbeil, Baabda, Aley, Keserwan and Metn.

Eng. Mouin Samhat has also performed other free-lance contracts as follows:
1-From February 2004 till March 2006: execution of Pangea Beach & Resort-Jiye as a main contractor for excavation and reinforced concrete works (10000 m³), and masonry and plaster works. The project included a big swimming pool for adults and another one for kids, a hotel of 4 floors, 30 chalets of different types (Type A-B-C), a restaurant of 3 floors and 2 floors cabins, knowing that the area of each floor is 1200m², under the supervision of Eng. Mohammad Charafeddine 03/612621 and the owner of the project: Rafic Charafeddine Establishment, Verdun, Charaeddine Building.
2-From October 2006 till November 2009: Supervision over allocation project in Bablieh including roads construction, installation of 7 infrastructures, asphalting, pavements and border stones. Owner of the project is Mr. Ghazi Hoteit.
3-From December 1, 2008 till May 31, 2008: execution of water networks in Baabda & Aley for Eng. Elie Naim Maalouf’s office.
4-From November 1, 2009 till November 15, 2010: execution of water networks in Baabda for Eng. Moussa Faour’s office.
5-From August 15, 2010 till August 3, 2011: execution of water networks in Baabda for Lemaco.
6-From December 2011 till November 2012: execution of water networks in Jbeil for Josef Maalouf Establishment.

 

List of Projects

Establishment of The Water of Beirut & Mount Lebanon:

  1. Installation of pipes and tubes in 2010-11-12 in Baabda.
  2. Installation of pipes and tubes in 2013 in Jbeil.
  3. Maintenance of the water treatment facility of Metn Al Aleh in 2010-11-12-13-14 to present.
  4. Maintenance of the water treatment facility of Jbeil in 2011.
  5. Maintenance of the water treatment of Keserwan in 2012-13-14.
  6. Operation & Management for 3 Water Treatment Facilities in Metn Al Aleh 2014 to 2015.
  7. Management & Maintenance of some sewage plants in Chouf Al Swayjani 2014.

Establishment of The Water of South Lebanon:

  1. Maintenance of the water treatment facility in Bent Jbeil 2014.
  2. Maintenance of the water treatment facility in Nabatiyeh 2014.
  3. Installation of pipes & tubes from Markaba to Houla.

Establishment of The Water of Bekaa:

  1. Provider of the polyethylene pipes and tubes plus there accessories in 2014.
  2. Maintenance of the water treatment facilities in the entire region.

Establishment of The Water of North Lebanon:

  1. Provider of some storage accessories in 2012 2013.

Contact Form

Address:

Chiyah, Beirut, Lebanon

Saida Old Road

Dallas Center, 4th Floor

Phone:

+961 1 390710

+961 3 635 218

Email:

info@teamscontracting.com