Experience

As for Eng. Mouin Samhat’s experience in roads and infrastructure, it has started since 1997 as an employee as follows:
1-From November 1997 till may 1998: worked at ASACo in soil and building material testing.
2-From June 1998 till April 1999: worked at Contrancimax in construction of the road from Rai’i Hospital to Ghazieh Bridge.
3-From May 1999 ill August 2000: worked at Al Tajj-Rawa union in Meshref Typical Village in roads construction with infrastructure and pavements.
4-From September 2000 till October 2004: worked at Eng. Yasser Noureddine office in Taybé project including road construction from Baydar Al Fakaani Till Litani River, the construction of a pumping station and a 500m³ water tank in Markaba, in addition to the supervision over Ward Company in Ain Al Zarka project in West Bekaa including the construction of water tanks of 2000m³ capacity, and installation of piping network with variable diameters and overall length of 165 km and construction of 3 pumping stations.
5-From November 2004 till February 2006: worked at Al Bahar Company for reinforced concrete construction.
6-From March 2006 till November 2009: worked at Metal contracting & trading company in execution of various water projects, water tanks construction , water treatment and pumping stations in Jbeil, baabda, Aley, Keserwan and Metn.

Eng. Mouin Samhat has also performed other free-lance contracts as follows:
1-From February 2004 till March 2006: execution of Pangea Beach & Resort-Jiye as a main contractor for excavation and reinforced concrete works (10000 m³), and masonry and plaster works. The project included a big swimming pool for adults and another one for kids, a hotel of 4 floors, 30 chalets of different types (Type A-B-C), a restaurant of 3 floors and 2 floors cabins, knowing that the area of each floor is 1200m², under the supervision of Eng. Mohamad Charafeddine 03/612621 and the owner of the project: Rafic Charafeddine Establishment, Verdun, Charaeddine Building.
2-From October 2006 till November 2009: Supervision over allocation project in Bablieh including roads construction, installation of 7 infrastructures, asphalting, pavements and border stones. Owner of the project is Mr. ghazi Hoteit.
3-From December 1, 2008 till May 31, 2008: execution of water networks in Baabda & Aley for Eng. Elie Naim Maalouf’s office .
4-From November 1, 2009 till November 15, 2010: execution of water networks in Baabda for Eng. Moussa Faour’s office.
5-From August 15, 2010 till August 3, 2011: execution of water networks in Baabda for Lemaco.
6-From December 2011 till November 2012: execution of water networks in Jbeil for Josef Maalouf Establishment.
7-Maintanace of the water treatment of Keserwan in 2012-13-14.
8-Operation & Management for 3 Water Treatment Facilities in Metn Al Aleh 2014 to 2016.
9-Management & Maintenance of some sewage plants in Chouf Al Swayjani 2014 to 2016.